English

中文

Svenska

Stockholm August 29,  2007

 

Nanjing Scandinavian Industrial Campus ground breaking  ceremony for Phase 1

Nanjing Scandinavian Industrial Campus (NSIC) commenced construction of the Scandinavian industrial campus in August.  The opening ceremony was held on August 29.

Phase 1 includes the development of  33 000 sqm industrial land in Nanjing Jiangning Science Park with a 4 storey office building of 5200 sqm, one two storey factory for light manufacturing of 2x4000 sqm and a factory for medium heavy manufacturing of 1x8000 sqm, with a possibility to add a mezzanine floor.

Phase 1 is planned to be ready during the first quarter of 2008.

The total plan is to develop a land area of 140 000 sqm with office buildings, factory buildings and warehouse buildings for foreign companies.

NSIC is building standard facilities for renting out but can also do built-to-suit for enterprises with specific requirements.

 

 

Li ’Charlie’ Zuo and Ulf Malmerberg

© 2008 Nanjing Scandinavian Industrial Campus AB